I had planned to work Wednesday night and Thursday night on the binding to get it done, but life took a turn on Wednesday and my boss got very sick and had to go into the hospital. Which meant my work load went through the roof. By the time I got home at night I was too tired to do anything.
So the quilt sits on the table waiting. But I am going to make a push to finish it on Monday or Tuesday (which are my days off). I'm hoping Callie and Beau love it. I did snap a small pic of it to tease Callie.
So lets get to the numbers
Fabric Used this Week: 5 1/2 yards
Fabric Used year to Date: 104 1/2 yards
Fabric Added this Week: 0 yards
Fabric Added Year to Date: 58 3/4 yards
Net Fabric for 2017: 45 1/2 yards used
Hopefully we will have even more to report next week. Sharla is working on her True Colors quilt and hopes to get all the blocks finished this week and only have the sashing left. I want to finish Callie and Beau's quilt and then start another. But a lot of what I get done will be determined by if my boss gets back to work this week. I'm really hoping so for his sake and mine. Today I'm linking up with Judy @ Patchwork Times.
You ARE a tease. But that is a great way to show a quilt and not really "show" the quilt. lol Your used numbers are terrific. I am aiming for the same, but it's not going as fast as I had hoped. Hope your boss is out of the hospital and your workload lightens up.
ReplyDeleteTake care of yourself; no need for you to work so hard you get sick, too! I am sure Callie will be thrilled when you can get the quilt finished. :)
ReplyDelete