I could just copy my goals from October to November, but that would be too easy and too lazy for even me. Plus I'm going to change up things just a little. I have a lot I have to get done between now and the end of the month, I know I won't get it all done, but hopefully at least some of it.
1. Finish my Looking Glass test quilt. I want to get the top completed, and if all possible it quilted as well. I have all the fabric cut, and am in the process of piecing the blocks. If all goes well the top will be done by this weekend. Here are the fabrics I chose.
2. Finish at least 2 of the memory quilts. I still struggle to work on these. I make progress and then I stop. The deadline I set for myself is fast approaching, so I have to get myself in gear and soon. This is what I have done so far.
3. Quilt 3 quilts and bind them. Now the most likely three would be two memory quilts and my Looking Glass quilt, but I have a stash of quilts I need to quilt, so it could be any three. But I am really looking forward to quilting this one, because it is the biggest top I have and will almost work as a bed quilt.
4. Complete my bee blocks and get them into the mail. This month we're doing bow tie blocks.
Now that is where I'm going to stop, do I have more to do, you bet. But if I complete the above list I will be very very happy. If I get more done, it will be even better. I am linking up with Shanna of Fiber of All Sorts and Melissa of BitterSweet Designs.
Subscribe to:
Post Comments (Atom)
Are you doing anything special working with the memory quilt shirt fabrics? I might be wanting / needing to make a few memory quilts soon and was wondering if you have any tips.
ReplyDeleteYour Looking Glass fabric pull is beautiful! :)
That is a lot for one month! Good luck!
ReplyDeleteI love your fabrics for Looking Glass, I can't wait to see the quilt top :)
ReplyDelete